› Pre-2022 Etchells Class Rules › F.3.1 Mast Materials › Reply To: F.3.1 Mast Materials
November 9, 2019 at 5:59 pm #7507
Matt
Administrator
Administrator
Another way to consider this is since the mast (and boom!) must be obtained from a licensed spar maker, why do we need this requirement at all? These requirements should be in the super secret Etchells Builder’s Specification.